Sunlit late-fall pasture with a galvanized water trough, a short ranch fence and distant grazing cattle among oak-lined acreage.

Before You Offer on Colbert Acreage, Find Out Who Sells the Water

Off the Colbert exit on Highway 69/75, a row of numbered tracts on Sims Road came to market in January 2026. They range from about 1.9 to about 4.5 acres, with asking prices of $100,000 to $135,000. The 2.5-acre parcel at 29 Sims Road is listed at $125,000. Its listing says water and sewer are not available, and the neighborhood field reads "Bryan Co Unplatted."

That line about water matters more than the acreage figure. The asking price covers the dirt. Water is a second price, and it depends on which water system the tract sits in, how far the nearest main is, and how much water you plan to run through it once horses or cattle are on the place. Around Colbert you can find that second price before you make an offer, and this fall's market gives you time to do it.

Two Systems Cover the Ground Around Town

The Oklahoma Water Resources Board keeps a map of approximate water-system service areas. Around Colbert it shows two providers: the Town of Colbert's system, Colbert PUA, and Bryan County Rural Water District #5. The boundaries in that layer come from a rural water survey taken in 2000. They show roughly where each system runs. They do not tell you whether a particular parcel on a particular county road can get a meter. Only the district office can answer that.

The two systems get their water in different ways, and that difference decides who you call and what you should ask.

Colbert PUA Bryan County RWD #5
DEQ system number OK2000716 OK3000704
Where the water comes from Eight groundwater wells, per its 2026 report covering 2025 Bought from Durant Utilities Authority, plus one well of its own
Size 1,043 residential connections 4,491 residential connections
Office Town of Colbert, 580-296-2560 22404 State Road 78 S, Durant

The two systems are also tied to each other. Oklahoma DEQ's record for Colbert PUA lists an emergency interconnection that lets the town buy water from RWD #5. Whichever side of the line your tract is on, your water partly depends on a system you will never get a bill from.

What a Meter Costs on the Rural Water Side

RWD #5 publishes its fees. A standard 5/8-inch residential meter tap is $3,800. A 1-inch tap is $5,500, and a 2-inch tap is $7,500. If the main runs along the far side of the road, add a road bore at $2,000 to $2,500, depending on the road. The district notes that its prices are subject to change.

On a tract like the one at 29 Sims Road, a 5/8-inch tap plus a road bore comes to $5,800 to $6,300 at today's posted rates. That is about 5 percent on top of a $125,000 asking price. If a barn, a wash rack and a house will all draw from the same meter and you want the 1-inch tap, the total is $7,500 to $8,000. And all of this assumes the main already runs along your frontage. If the nearest line is a quarter mile down the road, ask the district for that cost in writing before you count on its posted fees.

A Livestock Water Bill Is Its Own Line Item

Monthly rates look small until animals are drinking from the meter. On RWD #5's published 5/8-inch residential table, the base rate is $28. Two thousand gallons comes to $40.00, and 5,000 gallons comes to $61.96. Above 5,000 gallons, each additional 1,000 costs $7.00, and the rate steps up to $7.50 and then $8.00 per thousand at 25,000 and 50,000 gallons.

Working from that table, a month at 10,000 gallons runs about $97, and a month at 20,000 gallons runs about $167. A household that adds a few horses, a stock tank on a float valve and a summer of watering an arena moves from the bottom of that table toward the top. More than two decades of contracting work have taught me to decide where the water will go on the property before you decide which meter to buy. Running a second line from the house meter to the barn is a trenching job. Paying the district for a larger tap later costs more.

Bryan County RWD #2, the Mead-based district that has an interconnection with RWD #5 on file with DEQ, sent its members an annual meeting notice this fall. It raises the 5/8-inch base rate by $3, to $31, starting with January 2027 bills, and says the district will no longer offer pasture taps as a meter option. Both changes apply to RWD #2's own members, so they do not set what RWD #5 charges. They do show how one of the county's larger rural districts is handling demand.

The Supply Behind the Meter Is Still Being Built

The same notice says RWD #2 is building a new storage tank, a new well, an expanded treatment plant and an upgraded raw-water pump station. The district estimates the total at about $40 million, funded with grants plus a 40-year federal loan. Garver, its engineer, writes that Bryan County's growth had forced a moratorium on new developments in the district. Garver also says the first phase, which includes the treatment plant, a replacement intake on the Blue River, a new arterial main and an elevated tank, is the work that lets new developments start connecting again. A $9 million ARPA grant requires a substantial portion of that work to be done by the end of 2026, and the Choctaw Nation is a funding partner.

Inside town, Colbert's own wells carry the load. In May 2024, KXII reported that town leaders were planning an eleventh well. They were targeting 100 to 150 gallons per minute, compared with the 30 to 60 gallons per minute the existing wells typically produced, at a possible cost of about $400,000, with possible grant help from the Chickasaw Nation. In February 2025, KXII reported that Mayor Tim Fullen said the town had seen falling water levels and was rationing while it searched for a leak. For a buyer, the practical question for whichever system serves the tract is the same: is the system adding new meters now, and how long is the wait?

Drilling Is an Option With Its Own Math

Some buyers plan to skip the district and drill. In its March 2026 report, the Oklahoma Water Resources Board says the Woodbine aquifer underlies most of Bryan County. Across all the Woodbine well logs the board summarized, the median depth was 160 feet and the median reported yield was 15 gallons per minute. The averages were 187 feet and 29 gallons per minute. The Antlers aquifer lies below the Woodbine. The OWRB says wells in the Antlers across parts of Bryan County commonly yield 100 to 500 gallons per minute, and near the river there is a separate Red River alluvial aquifer.

Those figures describe the aquifer as a whole, and any one parcel can come in above or below them. A 15-gallon-per-minute well can run a house. Whether it can also fill troughs on a dry August afternoon depends on storage, pump sizing and how many head you're carrying. Get a driller's opinion on depth and target formation for that specific location before a well becomes the plan that makes the price work.

The Market Is Giving Buyers Time to Ask

This is a good season to ask these questions slowly. MLS Technology's October 2026 report for Bryan County residential property shows 277 active listings at the end of the month. That works out to 7.45 months of supply, up from 6.18 in October 2025. Eighty-three new listings came on in October 2026 against 39 closings. The median sale price for the month was $200,000, down 17.73 percent from October 2025, and the median home took 32 days to sell, up from 29. These figures cover homes countywide in that MLS, not raw land around Colbert alone. Still, the direction is clear enough. More sellers are waiting on fewer buyers than a year ago.

In practice, a buyer this fall can usually take a week to call the right district, get a written answer on meter availability and line distance, and price a road bore before committing to a tract. A seller who already has that answer has a tract that is easier to buy. If you own land near Colbert and plan to list, a letter from the district confirming service will do more for the listing than any photo of the pasture.

Here is the order I'd work in on any unplatted Colbert tract:

  1. Find the parcel on the county map, then call Colbert PUA at 580-296-2560 or RWD #5 at its Durant office to confirm which system serves it.
  2. Ask whether new meters are being set now, what the wait is, and where the nearest main runs in relation to the frontage.
  3. Price the meter size the whole property will need, including the barn, and add a road bore if the line is across the road.
  4. If a well is the backup plan, get a driller's read on that location before the option period ends.

For more on how improvements change the value of rural land, see this piece on land improvements on acreage and this walkthrough of turning raw land into a working mini ranch. The fees and rates above are the ones the districts post as current, and RWD #5 notes they can change. This post is general information, not legal, tax or financial advice, so confirm current charges and your own situation with the district and the right professionals before you rely on them.

If you're looking at acreage around Colbert and want someone to run the water question down before you write an offer, or you own a tract and want it priced with its water answer already in hand, Lauren McCambridge will walk the line with you and price what it takes to put a meter at the barn. Let's connect.

Work With Lauren

Lauren is dedicated to helping you find your dream home and assisting with any selling needs you may have. Contact her today so she can guide you through the buying and selling process.

Follow Me on Instagram